+1-800-346-6539 [email protected] Resources Blog

Molex Connector Insights & Guides

Expert articles on connector selection, installation techniques, and telecom industry trends from our engineering team.

Blog Tuesday 10th of November 2026

The 18% Discount That Cost Us $3,400: A Procurement Story About Cheap SFP Modules

A procurement manager's account of choosing a lower-priced optical transceiver quote, what the fine print actually cost, and the TCO rules that came out of it — including the Finisar FTLF8536P4BCL and FCLF-8521-3 modules we ended up standardizing on.

By Nkiru Obasi
Read More
Blog Tuesday 10th of November 2026

Buying EXFO Test Gear: 7 Questions I Asked Before Signing (From the Procurement Side)

A procurement manager's FAQ on buying EXFO fiber test equipment — DWDM OTDR vs standard OTDR, used FTB-200 tradeoffs, proving a link is ready for service, and the hidden costs that never make the quote.

By Hiroshi Takeda
Read More
Blog Friday 6th of November 2026

那次精密电阻采购复盘:报价单上没写的三个隐形成本

一个采购经理的完整经历复盘。从查“Vishay 标准电阻值”查到头疼,到用 Fluke 117 万用表踩坑,再到搞清原产地和精度等级背后的真实成本。写给同样需要对总成本负责的人。

By Valeria Conti
Read More
Blog Friday 6th of November 2026

The Real Cost of Cheap Connectors: What Samtec Pricing Taught Me About TCO

A procurement manager with 6 years of connector sourcing experience breaks down why the lowest quoted price on Samtec connectors (or any interconnect) is rarely the lowest total cost — and how hidden tooling, testing, and rework charges quietly drain budgets.

By Soren Mikkelsen
Read More
Blog Tuesday 3rd of November 2026

Kemet and Yageo Kemet: FAQs Engineers and Procurement Managers Keep Asking

Practical FAQs about Kemet ceramic capacitors, the Yageo acquisition, verifying genuine parts, and choosing the right test equipment — from a quality compliance manager who has audited 200+ component deliveries.

By Amina Diallo
Read More
Blog Tuesday 3rd of November 2026

We Refreshed Five OTDRs in 2024. Here's Why the EXFO FTB Platform Beat the 'Cheaper' Quote.

A procurement manager at a 350-person network services firm walks through the C300 project — three vendor quotes, one hidden calibration clause, and the TCO spreadsheet that put the EXFO FTB platform and FOT-930 loss tester ahead of a lower sticker price.

By Rowan Whitaker
Read More
Blog Friday 18th of September 2026

The Heat Shrink Tubing Problem Nobody Wants to Admit They Have

A quality/compliance manager's honest account of why cheap heat shrinkable sleeves fail—and what actually matters when you're specifying flame retardant heat shrink tubing for production.

By Rowan Whitaker
Read More
Blog Wednesday 16th of September 2026

Molex Ethernet vs Cisco: A Procurement Guide for Three Very Different Scenarios

A procurement manager's scenario-based breakdown of when Molex ethernet connectors justify their premium, when Cisco's pre-terminated approach makes more sense, and how to use voltage drop testing to decide.

By Rowan Whitaker
Read More
Blog Wednesday 16th of September 2026

Molex Connector Sourcing in 2025: TCO, Woodhead Molex, and Molex de Mexico

A procurement manager's practical guide to buying Molex connectors, checking Woodhead Molex legacy parts, understanding Molex de Mexico sourcing, and ignoring irrelevant searches like Jack Gold Rush or where to buy blood pressure monitor.

By Rowan Whitaker
Read More
Blog Wednesday 16th of September 2026

Molex 5-Pin Connectors, the Fluke 117, and Crimping Pins: What I Learned After $8,400 in Mistakes

A practical guide to Molex connector purpose, Molex 5-pin pinouts, using a Fluke 117 multimeter vs a network tester, and how to crimp pins without wasting a batch.

By Rowan Whitaker
Read More